The Project.

The nine new buildings – including an Administration/Library, Physical Education, Amphitheater, Performing Arts/Food Services, Science Center, and Technology Center – are accompanied by a pool, pool structures, stadium, sports fields, and associated parking areas, lighting standards, and utility improvements.

Client:

Desert Sands Unified School District

Location:

Palm Desert, CA

Services:

  • Environmental
  • Geotechnical
  • Geotechnical Testing
  • Special Inspection
  • Materials Testing

Project Fact:

The District was able to save more than $100,000 through Leighton’s diligent and responsive service by eliminating the need for Type V concrete and sand shading under building slabs.

The Leighton Solution.

Leighton has provided services for several school properties for this District, including this new high school.

We determined that near surface eolian deposits were unsuitable for support of structures, structural fill or hardscape, in the current loose and dry in-situ condition.

Recommendations were provided within proposed building footprints, that loose and dry sands should be over-excavated, wetted to at or slightly above optimum moisture, and then placed and compacted in lifts. Alternatives which would impact the construction cost were also provided such as the use of geogrid with removal depths decreased.