The Project.
This phase of the project included major improvements to the I-15/SR-76 interchange including improvements to existing on- and off-ramps and the addition of two loop on-ramps to I-15, to improve traffic operations and efficiency. Leighton also worked on the first segment, which was completed in 1999.
Client:
SANDAG/CALTROP
Location:
San Diego County, CA
Services:
- Geotechnical
- Materials Testing
Project Fact:
The SR76 East Project is the final segment in a series of three improvement projects to the SR 76 corridor located between I-15 and I-5, taking a two-lane undivided highway to four lanes.
The Leighton Solution.
Leighton, as a subconsultant, provided quality assurance special inspection, materials testing, and geotechnical testing on task-orders from a three-year SANDAG IDIQ Professional and Technical Construction Management and Engineering Services contract.
On this task order, Leighton provided acceptance testing in support of Caltrans D11 staff. A Leighton engineering technician performed on site acceptance testing to verify Quality Assurance Testing in accordance with the Material Control Schedule, for soil and concrete.